Create a Topology with EX-Switch and Mist AP for Wired/Wireless Assurance Lab With this slight Lab modification, we can test the full-Stack End to End Solution for the Juniper enabled Branch. Naturally you need at minimum one additional EX-Switch (better two if you want to test VC as well) and if possible a...
- Getting Started
- Wireless
- Wired Switching
- WAN Edge
- Mist Access Assurance
- Location Based Services
- Premium Analytics
- Security and Cloud Administration
- MSP
- Automation
- Product Updates
- Marvis
- Security Alerts
- FAQ
Design Guides
Create a Topology with High-Avail Hub and Spoke 128T SSR Routers The following rules apply to SSR device based HA-Cluster configurations: Note – Devices in an HA pair must be identical. An HA pair with two SSR120s will work. An HA pair with one SSR120 and one SSR120-AE will not work. The Interface names...
In this chapter we describe an example of an implementation of SD-WAN with a typical Hub and Spoke scenario leveraging different transport technologies to show how it is implemented. Assume one builds a Lab to test this out before the actual roll-out happens. This is what you see then below. A Lab (simulating the real...